Wednesday, September 26, 2007

September 25, 2007

We sat down with the plans and made some decisions. The plans aren't great for detail so we figured out the measurements for the doors into the pantry and the bathroom. Both will be in the centre of their respective walls.

We've decided to switch the toilet and sink positions b/c Donnie doesn't want to pee next to the window ;) We're also going to wait until those walls are in before deciding how long to make the wall between the kitchen and the entry way. I'm not sure how it will look until I can get into the space.

We're still unsure what to do about the upstairs. We don't want to get a permit because we don't want to be forced to complete the upstairs if we don't have the money. On the other hand, we don't want to be prevented from bringing electrical up there. Hopefully Doug will have some insight for us on that issue. We're thinking maybe we can bring the electrical up and coil it in the walls for future use.

0 Comments:

Post a Comment

<< Home