April 25, 2007
We picked up the engineer stamped plans from Fall River today. The engineer made a few minor changes. He switched the 6X12 beams to 8X12 and he required one additonal beam in the basement. Now I need to get those stamped plans to the permit place for approval.
0 Comments:
Post a Comment
<< Home